Skip to main content
    1. Complete Automation Systems for Rehman Production Facility (RPF)

    The customer wanted to upgrade their existing Gas Processing Facility by automating their Plant Control System and Field Instrumentation near Karachi. YOKOGAWA & ENERTECH were asked to provide Process Control System, Safety, F&G System and Field Instrumentation for their complete facility. YOKOGAWA & ENERTECH’s team took on the Supply, Engineering, Integration, startup, and commissioning of the complete system.

    The scope involved Complete Engineering, Installation and Commissioning of

    • ICSS using Yokogawa Centum VP R 6.08 and Prosafe RS R 4.06
    • Yokogawa Field Instrumentation including Pressure, Temperature TXs and Flowmeters
    • Level Transmitters from Vega
    • Control Valves
    • Instrumentation Cables along with Cable laying services etc.

situs toto slot

situs toto

toto togel

toto slot

toto slot

link slot gacor

slot thailand

slot gacor

bento4d

bento4d

rtp slot gacor

situs slot

situs gacor

rtp slot

slot gacor

slot gacor

slot gacor

rtp slot

Leave a Reply