- Control System for OMV Pakistan – Kadanwari Gas FieldÂ
The client wanted to upgrade existing control system installed at main facility to a standardized control system. YOKOGAWA & ENERTECH were selected as the preferred Control System Vendor by the customer to engineer and commission the system. The scope included Engineering, Installation and Commissioning of Yokogawa CENTUM VP R.6.01 at the CCR of Kadanwari Central Processing Facility. - OMV Pakistan G.m.b.H – Mehar Gas Plant De-Bottlenecking Project
Commissioning support for Yokogawa CENTUM VP R 5.0 at OMV Mehar Gas Plant. - OMV Pakistan G.m.b.H – Mehar Gas Plant De-Bottlenecking Project
Supply, Engineering, Installation & Commissioning of Yokogawa CENTUM VP R. 5.04. - OMV Pakistan G.m.b.H – Latif Gas Field Development Project
Supply, Installation, Termination and Commissioning of Yokogawa Pressure & Temperature Instruments at Latif’s Wellheads. - Control System for OMV Pakistan G.m.b.H – Rehmat Gas Plant
Supply, Testing & Pre-Commissioning of Yokogawa CENTUM CS3000 R3 system. - RTUs for Rehmat Gas Field Wellheads
Supply, Testing & Pre-Commissioning of (Yokogawa Stardom) based RTUs for 03 wellheads at Rehmat Gas Field.
- Control System for OMV Pakistan – Kadanwari Gas FieldÂ